The existing partition to
be removed and
dividing
walls extended |
The original wall line to be moved across to the
edge of the
mezzanine floor. |
 |
 |
 |
 |
Temporary scaffold was erected, protection was applied to sheild machines below from possible debris
|
The new wall line set out and glazed modules
start to be erected with solid panel above to
allow for new ceiling line |
 |
 |
 |
 |
The new window modules in situ with
200mm timber skirting |
Glass installed, with manifestation applied, panels awaiting vinyl decoration |
 |
 |
 |
 |
| View from opposite staircase showing substantial bracing to support the new glazed partition. |
The completed doubled glazed partition with scaffold removed and clients equipment in their new studio |
 |
 |
 |
 |