The installation of a double glazed partition on the edge of an existing mezzanine floor with decoration of the entire area.

The existing partition to be removed and
dividing walls extended
The original wall line to be moved across to the
edge of the mezzanine floor.
The existing partition to be removed and dividing The original wall line to be moved across to the edge of the mezzanine floor.
Temporary scaffold was erected, protection was applied to sheild machines below from possible debris

The new wall line set out and glazed modules
start to be erected with solid panel above to
allow for new ceiling line
Temporary scaffold was erected, protection was applied to sheild machines below from possible debris The new wall line set out and glazed modules start to be erected with solid panel above to allow for new ceiling line
The new window modules in situ with
200mm timber skirting
Glass installed, with manifestation applied, panels awaiting vinyl decoration
The new window modules in situ with 200mm timber skirting Glass installed, with manifestation applied, panels awaiting vinyl decoration
View from opposite staircase showing substantial bracing to support the new glazed partition. The completed doubled glazed partition with scaffold removed and clients equipment in their new studio
View from opposite staircase showing substantial bracing to support the new glazed partition. The completed doubled glazed partition with scaffold removed and clients equipment in their new studio