Premiere
The installation of a mezzanine floor, Air-conditioning, Double glazed office, Teapoint, Toilet area, Internal wall cladding, Electrical installation, False frontage, Carpeting and electrical installation.
| The existing Business Unit with a foot print of 113sqm awaiting mezzanine install |
The industrial wall to be insulated, clad taped jointed and decorated |
 |
 |
 |
 |
| The new mezzanine installed, to floor built customer specifcation, based on usage. |
Wall awaiting cladding |
 |
 |
 |
 |
| Mezzanine floor installed above the existing toilet |
Lighting being raised and wall clad awaiting decoration |
 |
 |
 |
 |
| The factory lighting to be utilised on the mezzanine |
Existing Disabled toilet facilites to have new toilet built above |
 |
 |
 |
 |
|