Premiere continued...
| Teapoint with Stainless sink and mixer tap with connections for dishwasher |
Existing Disabled toilet facilities to have
new toilet
built above |
 |
 |
 |
 |
| The factory lighting to be utilised on the mezzanine |
False frontage fitted to allow natural light |
 |
 |
 |
 |
| Industrial brush fitted at the head enable to existing roller shutter to be lifted |
Air conditioning cassette fitted to the underside of the mezzanine |
 |
 |
 |
 |
| Two 'mouth organ' type AC cassettes mounted on the upper level |
New toilet facilities |
 |
 |
 |
 |