Swan Housing

The refurbishment of Pilgrim House, Billericay.
Commenced on the 6th of June

PHASE 1

Pilgrim House, Billericay 11.800sq  feet spread over 3 floors The dated office partitions all to be demolished.
Pilgrim House, Billericay 11.800sq  feet spread over 3 floors The dated office partitions all to be demolished
Kitchen areas along with... ...Toliet areas all to be demolished
Kitchen areas along with... ...Toliet areas all to be demolished
Every aspect of the building to be refurbished from the roof to the front door The existing roof plant all to be removed including air handling and water tank
Every aspect of the building to be refurbished from the roof to the front door The existing roof plant all to be removed including air handling and water tank
The building constructed of concrete and heated by central heating all to replaced by AC The central core of the building housing toilet facilites, all to be reconfigured
The building constructed of concrete and heated by central heating all to replaced by AC The central core of the building housing toilet facilites, all to be reconfigured
Next>>
 
investor | Sitemap
T: 01622 66 32 32   Fax: 01622 66 31 31   E: info@rapofficecontracts.com