The refurbishment of Pilgrim House, Billericay.
Commenced on the 6th of June

PHASE 2

Air conditioning pipe work installation
3 pipe system blowing HOT & COLD
Along with cassettes
Air conditioning pipe work installation Along with cassettes
Boths Gents and ladies toilet areas containing areas from this 4 Kilometres of Cat 5e data cable...
Boths Gents and ladies toilet areas containing 4 Kilometres of Cat 5e data cable...
Previous dated board room New meeting room with interactive white board and RGB projector
Previous dated board room New meeting room with interactive white board
IPS pre-plumbed panels transforming the  to this All neatly distributed throughout the 3 floors
IPS pre-plumbed panels transforming the to this All neatly distributed throughout the 3 floors