| Ceiling grid with tiles and lighting installed. Skirting conduit on each floor |
Double glazed office (right)
First aid room (left) |
 |
 |
 |
 |
| AC pipe runs from the back of building into a reinforced trench across car park |
Condensors for AC over the 3 floors |
 |
 |
 |
 |
| Reinforced concrete trench housing power and pipe feeds for AC |
Installation of new roof air handling plant |
 |
 |
 |
 |
| Previously dated kitchen replaced by... |
...New kitchen and appliances |
 |
 |
 |
 |