Swan Housing

The refurbishment of Pilgrim House, Billericay.
Commenced on the 6th of June

PHASE 2

Ceiling grid with tiles and lighting installed. Skirting conduit on each floor Double glazed office (right)
First aid room (left)
Ceiling grid with tiles and lighting installed. Skirting conduit on each floor Double glazed office (right)
AC pipe runs from the back of building into a reinforced trench across car park Condensors for AC over the 3 floors
AC pipe runs from the back of building into a reinforced trench across car park Condensors for AC over the 3 floors
Reinforced concrete trench housing power and pipe feeds for AC Installation of new roof air handling plant
Reinforced concrete trench housing power and pipe feeds for AC Installation of new roof air handling plant
Previously dated kitchen replaced by... ...New kitchen and appliances
Previously dated kitchen replaced by... ...New kitchen and appliances